Lead times are one of the most misunderstood parts of a cabinet project. At One Source Cabinets, we hear it all the time: “So, when does the clock actually start?” Here’s the straight answer—because we’d rather set clear expectations than leave you guessing.
The Real Start Line
Your lead time doesn’t begin when you first meet with us. It doesn’t start when you pick colors. It doesn’t even start when you send over appliance specs.
Lead time begins only after you’ve signed off on the final design with no changes pending.
That’s the moment we can lock in every dimension, every finish, and every detail. Why? Because reworks or midstream changes don’t just nudge a schedule—they restart it.
What Happens After Sign-Off
Once you’ve approved your design, the process moves quickly but carefully:
-
On-Site Verification: Your coordinator double-checks every measurement.
-
Engineering Review: We confirm appliance specs and cabinet functions, looping back to you only if something needs clarification.
-
Production Launch: Materials are ordered—think five hundred colors, countless inserts, and hardware.
-
Shop Workflow: Each station cuts, edges, and assembles in phase, keeping the line moving so no one backs up.
Change your mind mid-process? The whole project has to be re-engineered, materials re-ordered, and timelines reset. That’s why approvals matter.
Warranty Lead Times
The same principle applies once your cabinets are installed. If you need a warranty part—say a chipped door or missing shelf—our process kicks in again:
-
Submit Quickly: Send a photo, your work order number, and a quick description.
-
We Verify: The part gets re-engineered and recut in our shop.
-
We Prioritize Based on Impact:
-
If a panel is holding up your countertop or appliance install, it jumps the line.
-
If it’s a loose hinge you can live with for a week, it gets slotted fairly.
-
The goal is to keep every project moving without leaving anyone stranded.
Why the Process Works
No process is flawless, but we’ve built in as many safeguards as possible:
-
Top-tier software to track every job and catch errors before they happen
-
Laser-guided cutters for unmatched precision
-
A seasoned crew who know how to spot and solve problems fast
The result? Cabinets arrive on-site with as little drama as possible.
At One Source Cabinets, we don’t play games with lead times. We’re upfront about when the clock starts, what can cause delays, and how warranty parts flow through the same system. The process is fast, fair, and built to keep you on schedule—because a perfect kitchen isn’t just about the finish, it’s about the journey to get there.